I was wondering about this. Why wouldn’t it be closed loop? My buddies and I allegedly built a moonshine still in high school and the coiled pipe or hose coming out the top recondenses the liquid that boils off. Why not do something similar and pump the hot water under snow covered sidewalks to melt them and then send it back to the data center to get heated again once it has lost enough heat?
I was wondering about this. Why wouldn’t it be closed loop? My buddies and I allegedly built a moonshine still in high school and the coiled pipe or hose coming out the top recondenses the liquid that boils off. Why not do something similar and pump the hot water under snow covered sidewalks to melt them and then send it back to the data center to get heated again once it has lost enough heat?
Evaporative cooling. Low cost.