busy

  • frog 🐸@beehaw.org
    link
    fedilink
    English
    arrow-up
    13
    ·
    edit-2
    8 months ago

    Group project is due tomorrow, including the presentation of the completed animation to the client. After one person on the team (who has been thoroughly documented in these threads over the last six months) got caught lying about how much of his sequence he had done, he was given an ultimatum: a hard deadline that passed fifteen minutes ago, and if he failed to meet it, someone else is doing his scene and his name is getting taken out of the credits. We could justify this as he hasn’t contributed significantly to any other part of the project.

    He failed to meet the deadline.

    I would like to note at this point that his scene is two shots totalling about 15 seconds. My scene was eight shots totalling 45 seconds and I was done last Friday.

    We have another assignment due at midnight tonight, which I sensibly/foolishly completed and handed in on Friday. Since everybody else is finishing that assignment this evening, I am the only one with any time available to animate and render this scene, I get to rig and animate the final scene of our animation. That’s why we can’t just cut the scene and work around it: the story would not have a conclusion without this scene. In retrospect we probably should never have trusted him with it, but it’s not like there was anything else that was short and simple he could have done.

    I am very angry with this guy, and I’m not convinced I’ll be able to hold my tongue if he turns up for the presentation tomorrow.